Water & Sewer

Overview

ADA has participated in several major water and wastewater projects for both the private and public sector throughout the State of Florida. Our staff has the proven ability of completing projects that enhance efficiency while providing sustainable operations.

Services

  • Pump Station Design
  • Transmission Lines
  • Water Distribution Facility Design
  • Waste-water Treatment Facility Design
  • Construction Management
  • Inspections
  • Collection Systems
  • Electrical Power Studies for Facilities
  • Treatment Facilities Design

Projects

NW 170th Street 36” Water Main Micro-tunneling Design – Miami-Dade Water & Sewer Department

The purpose of the project was to provide the design and permitting for a new 36″ DIP water main that will run along NW 170 Street from NW 87th Avenue to the new Hialeah Reverse Osmosis Water Plant. A.D.A. Engineering, Inc. (ADA), as a sub-consultant, was responsible for designing the micro-tunneling portion of the 36” DIP water main that traversed underneath I-75. The micro-tunneling consisted of a 52” Perma-lok casing with spacers.

 

In addition to the micro-tunneling design, ADA also designed the Maintenance of Traffic (MOT) for the entire project and was responsible for the permitting of the entire water main through the regulatory agencies including FDOT. Periodic site visits were performed during the micro-tunneling operation in order to certify the micro-tunneling portion of the water main.


New Force Main to Meet WASD Consent Decree & Rehabilitation of 54-inch Diameter Force Main from 280th Street to SW 248th Street – Miami-Dade Water & Sewer Department

 

As part of the Consent Decree Program, a new 54-inch force main that will run from SW 127 Avenue to SW 248 Street will be designed and constructed. ADA prepared conceptual plans, portions of the Basis of Design Report and Permit Matrix, utility coordination as well coordination with the regulatory agencies. ADA prepared the Maintenance of Traffic (MOT) plans for the entire project.

 

For the Rehabilitation of 54-inch Diameter Force Main project, ADA prepared concept plans, Basis of Design Report and Permit Matrix for Tier 1 for a Design Build requested by WASD. Subsequently, WASD requested that the concept plans become design plans for a conventional Design-Bid process. ADA has worked on the plan and profile drawings and selected pit locations based on the type of rehabilitation method selected to rehabilitate the existing 54-inch diameter PCCP force main. Rehabilitation methods include cured in place (CIP) technology. This project was placed on hold at the 60% submittal milestone.

 

The rehabilitation design includes tapping with line stops in existing force mains, insertion and pull pits, new plug valves, and connections to other large diameter force mains. ADA conducted all utility coordination and incorporated the information into the design drawings. In addition, ADA has coordinated with the permitting agencies involved to expedite the permit process. Some of the agencies include: The South Florida Water Management District (SFWMD), Army Corp of Engineers (ACOE), Miami Dade Regulatory and Economic Resources (RER), Florida Department of Transportation (FDOT), Florida Turnpike Authority (Turnpike), Miami Dade Public Works and Waste Management (PWWM) and many sub departments of Miami Dade County.

 

In addition to the micro-tunneling design, ADA also designed the Maintenance of Traffic (MOT) for the entire project and was responsible for the permitting of the entire water main through the regulatory agencies including FDOT. Periodic site visits were performed during the micro-tunneling operation in order to certify the micro-tunneling portion of the water main.