CITY OF DORAL GENERAL CONSULTANTS FOR ENGINEERING AND ARCHITECTURAL SERVICES

  • dsffdf

Project Description

ADA was contracted by the City of Doral to perform miscellaneous planning, design and construction management projects on a work order basis. The scope of work includes roadways, drainage, structural, bridge, electrical, mechanical, traffic engineering, civil/site planning, water and sewer, environmental assessments and engineering, land use and zoning, architectural design and space planning, construction management, and project management. ADA has held three consecutive contracts for General Engineering & Architectural Services. Under these contracts, ADA has worked on the projects listed below.

  • Canal Bank Stabilization Assessment Report – Project included the development of the report documenting the existing conditions of the canal banks maintained by the City of Doral. ADA developed a 10-year Canal Capital Improvement Plan (CCIP).

 

  • Canal Embankment Restoration Project Fiscal Year 1 and 2 Design – The scope of work entailed the development of 100 percent design drawings, specification, and construction cost estimates for the canals showing high levels of erosion under Fiscal Years 1 and 2 of the City of Doral’s CCIP. ADA also assisted the City in obtaining all required permits for construction. The Year 2 project received a “Project of the Year” Award from the American Public Works Association.

 

  • Canal Embankment Restoration Project Fiscal Year 1 and 2 Construction Administration Services – ADA has reviewed shop drawings and addressed Request for Clarification from the Contractor.
  • Drainage Feasibility Study for the Intersection of NW 82nd Avenue and NW 12th Street – ADA prepared a Drainage Feasibility Study to address the flooding at the intersection of NW 82nd Avenue and NW 12th Street. As part of this project, ADA performed hydraulic/hydrologic calculations using the SR 836 and NW 87th Avenue corridor improvements ICPR to analyze the existing and proposed alternative systems. ADA developed a preliminary drainage system layout of the preferred alternative and associated opinion of probable cost estimate.

 

  • Drainage Improvements for NW 25th Terrace from NW 99th to 100th Avenue – ADA was tasked with the preparation of construction plans to address the flooding along NW 25th Terrace from NW 99th to 100th Avenue. ADA’s assessment helped determine the most efficient and cost effective alternatives for the City, which included the use of a centrifugal water quality structure prior to discharging to the adjacent canal.