C-44 RESERVOIR-STORMWATER TREATMENT AREA PROJECT – SOUTH FLORIDA WATER MANAGEMENT DISTRICT

  • dsffdf

Project Description

The C-44 System Discharge construction contract includes the construction of a 120-foot-long concrete fixed-crest weir spillway (S-404) with an integral gated low level discharge structure; a 1,500-foot-long canal (C-402); and a new District field office including all of the associated roads, swales, drains, instrumentation, and utilities with these features. The C-44 STA construction contract includes six (6) STA cells with 6,300 acres of wetted area, approximately 30 miles each of canals and embankments, and over 50 water control structures including all of the associated roads, swales, drains, instrumentation, and utilities with these features. The C-44 Pump Station (S- 401) construction contract includes the construction of 1,100 cubic feet per second (cfs) electric two-story pump station, 600 feet of the 200-foot-wide C-44 Intake Canal (C- 400), and all of the associated roads, swales, drains, instrumentation, and utilities with these features. As part of this project, ADA is providing engineering during construction for the STA and reservoir project and is completing an O&M Manual to submit to the field station at the completion of the project.

popadminC-44 Reservoir/Stormwater Treatment Area